Know what happens in the room
Kitchen Cabinet Installation Process
Installation is a coordinated sequence rather than a single event. Understanding preparation, placement, countertop timing, and final adjustment helps homeowners plan access and related work.
Call now for service availability. Please have your 5-digit ZIP code ready.

01 / Planning guide
Before cabinets arrive
Confirm the approved layout, cabinet list, finish, hardware, appliances, and responsibility for removal. Prepare a protected, suitable area for delivery when required and clarify how product will be checked.
- Finalize appliance specifications
- Confirm room readiness
- Plan removal and disposal
- Protect adjacent spaces
- Clarify delivery access
02 / Planning guide
Layout and cabinet setting
Installers establish reference lines, identify fastening points, and account for floor and wall variations. Cabinets are positioned, leveled, joined, and secured while openings and clearances are checked.
- Tall and upper cabinet placement
- Base cabinet leveling
- Island position and anchoring
- Fillers and finished panels
- Door and drawer alignment
03 / Planning guide
After cabinet placement
Countertop templating generally follows stable base-cabinet installation. Plumbing, electrical, backsplash, and appliance connections are coordinated separately according to scope. Trim, hardware, touch-ups, and operating adjustments complete the cabinetry stage.
Project readiness
Cabinet Project Planning Checklist
The installation sequence is easier to plan when the room and selections are settled. Confirm these items first.
Questions homeowners ask
Frequently Asked Questions
What should happen before cabinets arrive?
Final selections and the cabinet schedule confirmed, appliance specifications locked, removal and disposal responsibility agreed, delivery access checked, a conditioned indoor space prepared for the cabinetry, and any wall, electrical or plumbing work coordinated.
When should old cabinets be removed?
Close to the installation date rather than far ahead, so the household is without a kitchen for as little time as possible — but early enough that any wall damage found behind them can be addressed before new cabinetry is set.
How should the room be prepared?
Clear the space entirely, protect adjacent flooring and doorways along the delivery path, confirm the finished-floor decision, make sure utility locations are known and accessible, and leave a clean, dry surface for level lines and fastening.
When are countertops templated?
After the base cabinets are installed, leveled and stable, because the template has to match the cabinets as set. Sink and faucet selections should be finalized before templating so cutouts are correct.
When are cabinet doors and hardware adjusted?
At the end of the cabinetry work, typically in a final pass once the boxes have settled in place and countertops are in. Hinge adjustment, drawer alignment, hardware installation and touch-ups all belong to that stage.
What work happens after cabinet installation?
Countertop installation, then backsplash, plumbing reconnection, electrical trim-out and appliance connections according to scope, followed by the final cabinetry walkthrough for alignment, operation and finish touch-ups.
Talk through your project
Planning New Kitchen Cabinetry?